Composite deck build in Montreal — start to finish
Kevork Ohanes
·
·
4 min read

A two-week composite deck build in Montreal, from the first site visit to the final board. Here’s how a build like this comes together.
Foundation first
Everything starts below ground. Concrete footings set below the frost line keep the deck level and stable through Quebec’s freeze-thaw cycles — skip this and the whole structure moves.
Frame, boards, and railing
We framed a square, code-compliant structure, laid composite boards for a low-maintenance surface, and finished with a clean cable railing that keeps the sightlines open.